ESTIMASI KEBUTUHAN SLURRY PADA PENYEMENAN CASING SUMUR PENGEBORAN MINYAK
Abstract
References
Baker Huges, INTEQ. 1995.Drilling Engineering Workbook. Baker Huges INTEQ. Houston United State of America.
Gusmao, Vania. 2009. Penyemenan trayek casing 13 3/8 dan 9 5/8 dan 7 Pada Sumur SLL-30. Laporan Kerja Praktek.
Mudofir, Achmad. 2002. Pengenalan Casing dan Penyemenan. Slide Presentasi.
Kent, Clark. 2006. Cementing System. Powerpoint Presentation.
Rubba, Ichwan. 2013. Perencanaan Kebutuhan Material Penyemenan Casing 13 3/8 Pada Sumur X Lapangan Y Kasim Marine Terminal (KMT) Sorong Papua Barat. Tugas Akhir Universitas Negeri Papua. Manokwari.
Schlumberger. 2003. Casing Operation Overview. Powerpoint Presentation.Cirebon.
Setiawan, Ridwan. 2009. Proses Penyemenan Pada Trayek Casing 13 3/8 Di Sumur X Lapangan Y. Prosposal Kerja Praktek. Akademi Minyak dan Gas Bumi Balongan. Indramayu.
Suman, George and Ellis, Richard. 1977. World Oil’s Cementing Handbook. Gulf Publishing Company. Houston, United States of America.
Smith, D. K. 1990. Cementing. Monograph Volume 4, SPE. Richardson, TX.
Rudi Rubiandini, 2009. Teknik Operasi Pemboran. Institut Teknologi Bandung. Bandung.
Wattimury, Petra. 2013. Evaluasi Perencanaan Rangkaian Casing Sumur X Lapangan Y. Tugas Akhir Universitas Negeri Papua.Manokwari.
DOI: http://dx.doi.org/10.30872/ts.v3i1.2758
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Teknologi Sipil